GPAD have secured planning permission for 130 Old Street, an existing office building in which they are currently one of the tenants. The refurbishment and extension of the existing building will deliver high quality office space as well as on site affordable workspace.
The retrofit project will see the retention of the existing concrete structure, with the addition of two new floors and extensions to the lower existing floors, providing a sustainable solution that will result in over eight storeys of floor space.
As part of the works, the principal façade will also be replaced with a new elevation that will look to improve the dialogue with the street through a more permeable ground floor. Juliette balconies on the upper floors create life; overlooking the street and animating it. The scheme proposes a palette of locally sourced brick and textured pink concrete to the principal façade, offset with metal cladding and fin details to the two new storeys and ground floor, creating a façade that has depth, a sense of permanence, and craft. The grid is dispersed with offset openings to make use of the existing structure and to break down the mass of the building.
Charles Bettes, Managing Director at GPAD: “We contribute to a lot of projects in Islington and particularly on Old Street and we hope that this scheme gives something back to the street whilst repositioning the existing building to meet the demands and desires of modern office users.”
GPAD are excited to have our White Lion Street project featured in the NLA Zero Carbon London report, which launched on 11 November. Read More
Our refurbishment of Kingsway Place in Clerkenwell, London has completed. Originally the cookery and laundry teaching facility of a nearby Victorian school, the building had been converted into two flats, which we have connected to form one spacious house.
Read More
GPAD’s proposal for the redevelopment of 2-7 Clerkenwell Green, Islington has received planning permission.
Our design is for a contemporary warehouse with a brick frontage and copper-clad mansard roof, sensitive to the conservation area.
The project will also provide a modern, open plan workplace with fully DDA compliant level access and modern amenities, as well as meeting the latest sustainability standards in terms of BREEAM and WELL building standards.
When complete the building will boast 23,048sqft of prime workspace spread over seven floors.
GPAD’s Managing Director, Charles Bettes has said: “We’re a retrofit first practice, opting for refurbishment over new build whenever feasible. The building at Clerkenwell Green, however, would need extensive adaptation and likely need to be replaced by a new build in the not too distant future, therefore it’s more sustainable to address the problems now.
Charles continues: “Our plan delivers not only a better looking, more considered building, it’s also much more energy efficient and space is much better used. This will offer improved longevity and flexibility, while being a positive addition to the character of the conservation area and the street.”
As part of the proposed design, the ground floor will offer workspace accommodation to SMEs. There will also be three roof terraces, cycle storage and showers.
GPAD is one of four to have its design chosen as a winning concept for the iconic Old Street roundabout redevelopment.
Read More
GPAD have secured planning approval for the development of a new high quality commercial building at 10-14 White Lion Street in Islington. When the 6,440sqm of office space development is completed it will provide a third of Islington’s annual new office space target. Read More