130 Old Street, London receives planning

1st June 2021

GPAD have secured planning permission for 130 Old Street, an existing office building in which they are currently one of the tenants. The refurbishment and extension of the existing building will deliver high quality office space as well as on site affordable workspace.

The retrofit project will see the retention of the existing concrete structure, with the addition of two new floors and extensions to the lower existing floors, providing a sustainable solution that will result in over eight storeys of floor space.

As part of the works, the principal façade will also be replaced with a new elevation that will look to improve the dialogue with the street through a more permeable ground floor. Juliette balconies on the upper floors create life; overlooking the street and animating it. The scheme proposes a palette of locally sourced brick and textured pink concrete to the principal façade, offset with metal cladding and fin details to the two new storeys and ground floor, creating a façade that has depth, a sense of permanence, and craft. The grid is dispersed with offset openings to make use of the existing structure and to break down the mass of the building.

Charles Bettes, Managing Director at GPAD: “We contribute to a lot of projects in Islington and particularly on Old Street and we hope that this scheme gives something back to the street whilst repositioning the existing building to meet the demands and desires of modern office users.”

Related News

  • Harrow Road shortlisted for a British Homes Award 2022

    We are pleased to announce that our housing scheme on Harrow Road, Settle, has been shortlisted for a British Homes Award in the Development of the Year (up to 20 Homes) category. This project is all about the quality of architecture and homes through a variety of methods including the use of protruding windows and […]

    13th July 2022 | News

  • GPAD completes Vienna House in Birmingham

    Vienna House underwent a refurbishment and extension to inject personality and create characterful offices. The scope of work included improvements to the reception area and the open-plan office floor plates which have been upgraded with a contemporary, warm interior fit-out and increased floor to ceiling heights. A new build cycle pavilion element has been added […]

    14th April 2022 | News

  • Adding value to office design through roof terraces; featured in OnOffice

    Due to recent circumstances the necessity for outdoor space has never been more important, not only due to the pandemic but also the general move towards improving mental and physical wellbeing within the workplace. With the average person spending 30% of their life working and the move back to office environments commencing, outdoor office space […]

    24th September 2021 | Press, News

  • Tailor’s Corner video featured in Estates Gazette, The Future of Leeds

    GPAD are pleased to share Estate Gazette’s latest video on The Future of Leeds. The half an hour video features projects across the city discusses Leeds can emerge from the pandemic and aim to be the best city in the UK. From 21 minutes onwards the video is shot from the new roof terrace at […]

    21st July 2021 | News